Fort Lauderdale Aquatic Center
Renovation Project Photo Gallery December 2021
South Building, 2nd Floor Interior December 17, 2021
South Building Exterior, along Service Road
Dive Well Curb, Concrete Pour December 28, 2021
The dive well will have a sparger “bubbler” system; the curb works to retain the water
Dive Well Pool Deck concrete pour; Pool decks must slope away from the pool to the drain; this work requires technical skill and detailed calculations
Circular Spa at the Dive Well
South Building, Pool Deck Level
View from the Dive Tower
Water and Sewer connection lines to support the South building