The 27M dive tower pile cap was poured on February 26. Planning a trip next week to Gate Precast in Kissimmee to see the last panels cast before the tower is erected.
Thank you to our design builder Hensel Phelps Construction Company. ![]()
![]()
![]()
![]()
We have the best construction crew ever !
Measurements and calculations are performed by two people for quality control.
Hard at Work !!!!
Sunrise
Hensel Phelps Field Engineer checking calculations.
Putting everything in its place !
Oscar and Chala with the HP craft team down inside the rebar cage checking the details.
Soon to be the GREATEST Dive Well in the WORLD!
Moving right along………